11 Jul 2010

Added the exhaust and messed about with the cooling and vacuum lines. Still need a few odds and ends but the list is getting short: fabricate vacuum block, add boost controller, add last coolant tubes, and possibly clean up electrical harness around the engine. The harness work is just shortening wires so that’s easy. There’s still getting the engine computer to talk to the dash, thought that’s supposed to “just work.” The oil pressure and temperature sensors are in but getting them interfaced and scaled will take some fiddling. It’s tempting to push it off but it would be good to have oil pressure on the dash during tuning. As far as everything else goes, there’s adding the suspension pivot tubes to the bottom of the rear uprights, doing a rough alignment… and that’s about it!