2 Dec 2008

With tube drawings starting an incentive seems in order. All the tube lengths are known – though not yet formally drawn up – so the numbers were totaled and tubing has been ordered! Since the main hoop and windscreen tube drawings are done they’ll get bent at the same time the tubing is picked up. All this happens next week, so between continuing with tube drawings and having the tubing on-hand, there’ll be plenty to do over the holiday break. First thing will be cleaning off the build table! Happy now?